Assignment Name: Design and Build of Fishery Landing Marine Sea Barrier.
Country: Yemen
Client: Socotra Archipelago Governorate
No of Staff-Months: 32 MM Duration of Assignment: 6 Months
Start Date (Month/Year): 15/03/2017
Completion Date (Month / Year): 25/01/2018
Approx. Value of Services (in Current US$): 124,000
Name of Associated Consultants, If Any: Non
Narrative Description of Project
The project included the construction of 123.3 m long super breakwater parallel to the sea with 3.7 m width in Hadebo – Socotra to prevent the water flood to the fish landing center. The project included rock base works in addition to concert structures and support as per the standards and requirements.
Description of Actual Services Provided by Your Staff:The company provided the following services: Comprehensive studies related to the construction. Detailed Engineering Designs. Construction works as per the standards and the contract requirements.
Consultant: HS-Group
Financed by: Emirates Red Crescent
Country: Yemen
Client: Socotra Archipelago Governorate
No of Staff-Months: 32 MM Duration of Assignment: 6 Months
Start Date (Month/Year): 15/03/2017
Completion Date (Month / Year): 25/01/2018
Approx. Value of Services (in Current US$): 124,000
Name of Associated Consultants, If Any: Non
Narrative Description of Project
The project included the construction of 123.3 m long super breakwater parallel to the sea with 3.7 m width in Hadebo – Socotra to prevent the water flood to the fish landing center. The project included rock base works in addition to concert structures and support as per the standards and requirements.
Description of Actual Services Provided by Your Staff:The company provided the following services: Comprehensive studies related to the construction. Detailed Engineering Designs. Construction works as per the standards and the contract requirements.
Consultant: HS-Group
Financed by: Emirates Red Crescent