Project’s Brief
- Undertaking preliminary traffic survey and study the traffic impact of the project
- Carryout a topographical survey for a 300 meters pavement and water storm drainage works
- Assisting the client in preparing a social impact studies of the project
- Estimating the soil baring capacity of the project area
- Preparing a spreadsheet tabulating the function, existing condition of the pavement and water storm drainage works.
- Confirm Design standards, sizes, and features.
Scope of Service
Review all the available environmental studies and reports, physical features and environmental conditions of project site, which include preparing the environmental assessments, environmental assessments policy depending on the nature of road impacts. |